House facade cleaning
Cleaning 570 m², water-repellent treatment and sealing window junctions.
Projects: 6.
Cleaning 570 m², water-repellent treatment and sealing window junctions.
Steps and landings clad in wood-look tiles. The work included cuts to fit the staircase geometry, tiled skirting, recessed lighting, wall preparation and painting, and balustrade renewal.
Decorative cladding of a projecting wall with white MDF panels and narrow mirror inserts. The vertical pattern continues across two faces, the external corner follows the same rhythm and the switch is integrated into the cladding.
Electric floor and wall heating, a drain, GROHE installation frame and substrate preparation.
Light marble-look tiles, metal profiles and a stepped skirting board.
Two coats of lacquered microcement and a vertical backsplash made from 50×300 mm clinker tiles.